Today I started more drawings for BTEC but only got so far on them until another employee got me started on something different. Somewhere along the way of entering all of the readings, temperatures and pressures there were a lot of mistakes that needed to be fixed. For the most part I am the person responsible for correcting these errors in the BTEC drawings such as where that particular line comes from, where it goes to, the design temperature and pressure (a.k.a. the temperature and pressure that that pipe was built to withstand), and the operating design and pressure (a.k.a. the temperature and pressure that that pipe was working at when the readings were taken. There are a lot of drawings that are wrong and it is my new job to make sure that they are not only just right but perfect even to the slightest digit.